Presentation of End-Line QA Assessment

Product quality is the fundamental point to increase sells. So, producer has to take strong imitative to keep product quality. Continues training, follow-up and motivation can ensure to deliver superior quality product.

Unit wise summary
* Unit: XZY-1

* Total line: 37

* End line training completed:

March to mid of May 2015.
* Plan for total number of end line QA assessment: 50
* Total number of end line QA assessment complete: 47
* Finish plan for end line QA assessment balance, re-trained and re-evaluate: 15 July 2015
* Unit: XZY-2
* Total line: 56
* End line training completed:
March to end of May 2015.
* Plan for total number of end line QA assessment: 92
* Total number of end line QA assessment complete: 92
* Finish plan for end line QA assessment balance, re-trained and re-evaluate: 15 July 2015

Skill evaluation scoring:
Total marks = 40 (8*5)
Grade
A 30~40
B 20~29
C below 20

End line QA assessment summary and action plan (Unit: XZY-1)

Summary
SL
Unit
Total Evaluated
Grade-A
Grade-B
Grade-C
1
 XZY-1
47
21
25
1
end line QA assessment
Action plan
* A grade inspector: will keep random monitor and verify
* B grade inspector: will educate them to overcome their weak points
Time line: 15th June to 30th June 2015
* Re-evaluation: 1st July to 7th July 2015
* C grade inspector: take from end line inspection; educate them from beginning of the inspection process
Time line: 10th June to 9th July 2015
* Re-evaluation: 11th July to 15th July 2015
End line QA assessment summary and action plan (Unit: XZY-2)
Summary
SL
Unit
Total Evaluated
Grade-A
Grade-B
Grade-C
1
XZY-2
92
14
59
19
Action plan
* A grade inspector: will keep random monitor and verify
* B grade inspector: will educate them to overcome their weak points
  Time line: 15th June to 30th June 2015
* Reassessment: 1st July to 7th July 2015
* C grade inspector: take from end line inspection; educate them from beginning of the inspection process
  Time line: 10th June to 9th July 2015
* Re-evaluation: 11th July to 15th July 2015
Please find my google drive link to know the process clearly. Please hit the link to download your desired file.